When our safety-conscious Ethanol client wanted to comply with explosion venting, it initially looked like a total baghouse replacement. However, the vendor was not able to recalculate the panel requirements based on the latest NFPA 68 standard after a baghouse in relatively good condition was repurposed.

JBW proposed a more cost-effective option. We provided non-destructive testing services to evaluate the vessel’s condition in hopes of verifying that its original Pred was adequate. Although several minor remediations were recommended, our client was able to confidently replace and relocate existing panels on the baghouse and save the cost of a new baghouse.