JBW partnered with another engineering firm to evaluate ventilation improvements at a manufacturing facility, with the primary goals of improving temperature control and reducing worker exposure to product off-gas fumes (VOCs). The scope included site scanning, equipment review, preliminary HVAC design specifications, and evaluation of existing heating, cooling, and ventilation systems. The assessment found that while the existing systems provided adequate heating and cooling, the recirculation system did not introduce sufficient fresh air or remove accumulating fumes from the shipping and storage area.

JBW developed two ventilation concepts targeting a maximum of three air changes per hour, consistent with ASHRAE recommendations for factory and warehouse spaces. The first option addressed the entire shipping and storage area, capturing and exhausting VOCs throughout the space using a new make-up air unit (MAU) and multiple exhaust fans. The second option focused on capturing fumes at their source by isolating the affected area with a new wall, reducing the required airflow and allowing for a smaller MAU and fewer exhaust fans.

The assessment outlined the benefits and limitations of each option, including energy consumption, installation costs, and the potential for VOCs to escape into surrounding areas when overhead doors are open. JBW also identified the potential to maintain negative pressure in the focused ventilation area to limit fume migration and recommended reviewing existing electrical capacity to determine whether system upgrades would be necessary.

Sectors

Services

Skip to content