JBW Consulting Engineers provided a professional services proposal for the Screener Upgrade Project. This proposal was based on a site visit, subsequent conversations, and a project data sheet supplied by the client. Due to increased throughput from the Green End upgrades, the project aimed to replace the existing overcapacity Acrowood dry screener with a rotary screener capable of handling up to 45,000 lbs/hr. The current location was crowded with equipment and support, necessitating engineering solutions to fit and operate the new screener.
JBW began by reviewing existing documentation, including models, 3D scans, equipment information, and site photos. They generated 1-3 concepts for review with plant stakeholders, each including plan views, section views, and a 3D isometric view. These concepts were reviewed in Navisworks to determine the best path forward. Once a concept was selected, JBW proceeded to generate issued-for-bid documents to develop the Phase II budget.
The scope of services included three site visits, concept drawings and models, and issued-for-bid documents covering mechanical and structural calculations and drawings. JBW also provided equipment specifications for the screener, conveyor components, valves/dampers, pipe/duct/fittings, and instrumentation. Additional services such as electrical or controls engineering and modeling of other systems were available upon request. Deliverables included concept drawing packages, issued-for-bid drawings, mechanical and structural scopes of work, and coordination models in Navisworks. The project was based on the assumption that JBW would have access to the site and sufficient information to perform the assessment and that timely feedback would be provided to move forward with the selected concept.



Contact Our Team
Connect with our team for your next project. We are committed to removing barriers and delivering innovative, efficient, and reliable engineering solutions.
- ||