The WIPP US Department of Energy nuclear waste disposal facility required a new storage building HVAC and fan cooling system designed. JBW was hired to create the design for the site construction mechanical contractor. The work was to be completed in a seismic zone with requirements for operability even after a seismic event. The new installation of ductwork, piping, and process equipment was required to meet the design standards and rules of construction for the state and the US government. The design required detailed knowledge of the hierarchy of the standard documents and specifications to determine controlling features of overlapping concerns to make the installation a robust design. Key relationships between ASCE, ASME, SMACNA, USDOE standards, and the state building code need to be followed. Resolving the competing rules for piping and supports was a key factor in analyzing the best installation and operation methods.



Sectors
- Nuclear
Services
Contact Our Team
Connect with our team for your next project. We are committed to removing barriers and delivering innovative, efficient, and reliable engineering solutions.
- ||