Piping Inspection Isometrics
Project Summary
The Tank Farm Piping Inspection Isometrics project involved the creation of Isometric Drawings for process piping located outside the refinery battery limits (OSBL). These drawings were intended to support API 570 Inspections and included Condition Monitoring Locations (CMLs). Using field-drawn isometrics provided by the client, JBW created the required drawings following the API 570 format. The project was estimated to consist of 150 isometric drawings, which depicted changes in direction, valves, pumps, tanks, exchangers, vessels, and other major equipment without including dimensions. JBW coordinated the project with a focus on ensuring compliance and correctness, with final drawings to be reviewed and approved by the client.
Services Provided
Mechanical Engineering
Pipe Stress Analysis
BIM Coordination